| 1. |
Appointment Scheduling - Achieving the Positive Ripple Effect Part 3: An Illustration (2 Pages)
by Rachel Nemecek
Jul 1, 2002 Abstract : Reducing wait time to just 17 hours per week would reflect a gain of approximately 32,160 miles per year by each trailer.
Type: Article
|
| 2. |
Appointment Scheduling - Achieving the Positive Ripple Effect Part 2: A Solution (4 Pages)
by Rachel Nemecek
Jun 28, 2002 Abstract : Integration of the appointment scheduling system with other systems is necessary for maximum benefit.
Type: Article
|
| 3. |
Appointment Scheduling - Achieving the Positive Ripple Effect Part 1 (6 Pages)
by Rachel Nemecek
Jun 27, 2002 Abstract : Accurate appointment scheduling can provide great benefit to all in the supply chain through improvements in efficiency, visibility, resource and capacity utilization, and product flow.
Type: Article
|
| 4. |
Integration is the Name of the Game in Software Systems (4 Pages)
by Rachel Davis
Aug 1, 2002 Abstract : This article, originally published in Engineering Times, on how companies are employing ERP is based on an interview with Ben Spencer, TECメs Senior Director of Knowledge Bases and Content Development.
Type: Article
|
| 5. |
Integration is the Name of the Game in Software Systems (4 Pages)
by Rachel Davis
Dec 11, 2001 Abstract : This article, originally published in Engineering Times, on how companies are employing ERP is based on an interview with Ben Spencer, TECメs Senior Director of Knowledge Bases and Content Development.
Type: Article
|